Effortlessly
Manage Your Projects

120+ Project Management Templates

Seamlessly manage your projects with our powerful & multi-purpose templates for project management.

120+ PM Templates Includes:
  • 50+ Excel Templates

  • 50+ PowerPoint Templates

  • 25+ Word Templates

Share Post

Examples of project charters include software development projects, construction projects, marketing campaigns, manufacturing process improvement projects, and human resources policy development projects. Each of these examples has unique elements, such as objectives, scopes, stakeholders, deliverables, milestones, timelines, budgets, risks, assumptions, project organizations, and sign-offs, which are outlined in their respective project charters.

Examples of Project Charter

Here are the real-time examples help demonstrate how project charters work in practice.  We have provided examples by each industry; you can check the verity of example of Project Charter.

Software development project charter

  • Project Objective: To develop and launch a new software product that meets customer needs and increases revenue for the company.
  • Project Scope: The scope of the project includes software design, development, testing, and launch.
  • Stakeholders: The stakeholders for the project include the software development team, the project sponsor, executive team, end-users, and investors.
  • Deliverables: The deliverables for the project include a functional and user-friendly software product, user manuals, and technical documentation.
  • Milestones: The milestones for the project include software design, software development, testing, and product launch.
  • Timeline: The project is expected to be completed within six months, with software design and development taking four months, testing taking one month, and product launch taking one month.
  • Budget: The project budget is $500,000, which includes costs for software design and development, testing, project management, and contingencies.
  • Risks and Assumptions: Risks include technical issues that may delay the project, and assumptions include the availability of resources and expertise needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the software development team, quality assurance, and the project sponsor.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Marketing campaign project charter

  • Project Objective: To launch a successful marketing campaign that increases brand awareness and drives sales for the company.
  • Project Scope: The scope of the project includes market research, campaign planning, creative development, media planning, and campaign execution.
  • Stakeholders: The stakeholders for the project include the marketing team, project sponsor, executive team, vendors, and customers.
  • Deliverables: The deliverables for the project include a detailed marketing campaign plan, creative assets, media plans, and post-campaign analysis report.
  • Milestones: The milestones for the project include market research and analysis, campaign planning and creative development, media planning and execution, and post-campaign analysis.
  • Timeline: The project is expected to be completed within three months, with market research and analysis taking two weeks, campaign planning and creative development taking four weeks, media planning and execution taking six weeks, and post-campaign analysis taking two weeks.
  • Budget: The project budget is $100,000, which includes costs for market research, creative development, media planning and execution, and contingencies.
  • Risks and Assumptions: Risks include unexpected changes in customer behavior, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the marketing team, creative agencies, media agencies, and the project sponsor.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Manufacturing process improvement project charter

  • Project Objective: To identify and implement process improvements that reduce costs and increase efficiency in the manufacturing process.
  • Project Scope: The scope of the project includes process analysis, process mapping, root cause analysis, solution identification, and implementation.
  • Stakeholders: The stakeholders for the project include the manufacturing team, project sponsor, executive team, and customers.
  • Deliverables: The deliverables for the project include process analysis report, process mapping report, root cause analysis report, solution identification report, and implementation plan.
  • Milestones: The milestones for the project include process analysis, process mapping, root cause analysis, solution identification, and implementation.
  • Timeline: The project is expected to be completed within six months, with process analysis and mapping taking two months, root cause analysis taking one month, solution identification taking two months, and implementation taking one month.
  • Budget: The project budget is $200,000, which includes costs for process analysis and mapping, root cause analysis, solution identification, and implementation.
  • Risks and Assumptions: Risks include unexpected technical issues, and assumptions include the availability of resources and expertise needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the manufacturing team and the project sponsor.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Human resources policy development project charter

  • Project Objective: To develop new human resources policies that align with company values and meet legal requirements.
  • Project Scope: The scope of the project includes policy research, policy development, policy implementation, and policy communication.
  • Stakeholders: The stakeholders for the project include the human resources team, project sponsor, executive team, and employees.
  • Deliverables: The deliverables for the project include a detailed policy report, policy documentation, training materials, and communication materials.
  • Milestones: The milestones for the project include policy research, policy development, policy implementation, and policy communication.
  • Timeline: The project is expected to be completed within six months, with policy research and development taking three months, policy implementation taking one month, and policy communication taking two months.
  • Budget: The project budget is $100,000, which includes costs for policy research and development, policy implementation, and communication.
  • Risks and Assumptions: Risks include legal issues that may arise, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the human resources team and the project sponsor.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Website Redesign Project Charter

  • Project Objective: To redesign the company website to improve user experience and increase conversions.
  • Project Scope: The scope of the project includes website analysis, wireframe development, design and development, content creation, and testing.
  • Stakeholders: The stakeholders for the project include the marketing team, project sponsor, executive team, and website users.
  • Deliverables: The deliverables for the project include website analysis report, wireframes, website design and development, new website content, and testing report.
  • Milestones: The milestones for the project include website analysis, wireframe development, website design and development, content creation, and testing.
  • Timeline: The project is expected to be completed within four months, with website analysis and wireframe development taking two weeks, website design and development taking two months, content creation taking one month, and testing taking one month.
  • Budget: The project budget is $150,000, which includes costs for website analysis, wireframe development, website design and development, content creation, and testing.
  • Risks and Assumptions: Risks include unexpected technical issues and delays, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the marketing team, website design and development agency, content creators, and the project sponsor.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Customer Relationship Management (CRM) Implementation Project Charter

  • Project Objective: To implement a new CRM system that improves customer management and enhances sales and marketing efforts.
  • Project Scope: The scope of the project includes CRM analysis, system selection, system implementation, data migration, and training.
  • Stakeholders: The stakeholders for the project include the sales team, marketing team, customer service team, project sponsor, executive team, and customers.
  • Deliverables: The deliverables for the project include CRM analysis report, CRM system selection report, system implementation plan, data migration plan, and training materials.
  • Milestones: The milestones for the project include CRM analysis, system selection, system implementation, data migration, and training.
  • Timeline: The project is expected to be completed within six months, with CRM analysis and system selection taking two months, system implementation taking three months, and training taking one month.
  • Budget: The project budget is $250,000, which includes costs for CRM analysis, system selection, system implementation, data migration, and training.
  • Risks and Assumptions: Risks include technical issues with the CRM system and delays in data migration, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the sales team, marketing team, customer service team, CRM vendor, and the project sponsor.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Supply Chain Optimization Project Charter

  • Project Objective: To optimize the supply chain process to reduce costs and improve efficiency.
  • Project Scope: The scope of the project includes supply chain analysis, process mapping, root cause analysis, solution identification, and implementation.
  • Stakeholders: The stakeholders for the project include the supply chain team, project sponsor, executive team, and customers.
  • Deliverables: The deliverables for the project include supply chain analysis report, process mapping report, root cause analysis report, solution identification report, and implementation plan.
  • Milestones: The milestones for the project include supply chain analysis, process mapping, root cause analysis, solution identification, and implementation.
  • Timeline: The project is expected to be completed within eight months, with supply chain analysis and mapping taking two months, root cause analysis and solution identification taking four months, and implementation taking two months.
  • Budget: The project budget is $500,000, which includes costs for supply chain analysis, process mapping, root cause analysis, solution identification, and implementation.
  • Risks and Assumptions: Risks include unexpected delays in the analysis and identification phases, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the supply chain team, project sponsor, and executive team.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Product Development Project Charter

  • Project Objective: To develop a new product that meets customer needs and generates revenue for the company.
  • Project Scope: The scope of the project includes product research, design, development, testing, and launch.
  • Stakeholders: The stakeholders for the project include the product development team, marketing team, project sponsor, executive team, and customers.
  • Deliverables: The deliverables for the project include product research report, product design and development, testing report, and product launch plan.
  • Milestones: The milestones for the project include product research, design and development, testing, and launch.
  • Timeline: The project is expected to be completed within 12 months, with product research and design taking four months, product development taking six months, testing taking one month, and product launch taking one month.
  • Budget: The project budget is $1 million, which includes costs for product research, design, development, testing, and launch.
  • Risks and Assumptions: Risks include unexpected delays in product development and testing, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the product development team, marketing team, project sponsor, and executive team.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Construction Project Charter:

  • Project Objective: To construct a commercial building for a client within budget and on schedule.
  • Project Scope: The scope of the project includes project planning, site preparation, building construction, and project closeout.
  • Stakeholders: The stakeholders for the project include the construction team, project sponsor, client, and local government agencies.
  • Deliverables: The deliverables for the project include project plan, building design and construction, construction schedule, and project closeout report.
  • Milestones: The milestones for the project include project planning, site preparation, building construction, and project closeout.
  • Timeline: The project is expected to be completed within 18 months, with project planning and site preparation taking four months, building construction taking 12 months, and project closeout taking two months.
  • Budget: The project budget is $10 million, which includes costs for project planning, site preparation, building construction, and project closeout.
  • Risks and Assumptions: Risks include weather delays, construction material shortages, and unforeseen expenses, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the construction team, project sponsor, and client.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and client.

Healthcare IT Project Charter:

  • Project Objective: To implement a new electronic medical records system within a healthcare facility.
  • Project Scope: The scope of the project includes software procurement, system configuration, user training, and system rollout.
  • Stakeholders: The stakeholders for the project include the IT team, healthcare providers, project sponsor, and executive team.
  • Deliverables: The deliverables for the project include software procurement report, system configuration report, user training materials, and system rollout plan.
  • Milestones: The milestones for the project include software procurement, system configuration, user training, and system rollout.
  • Timeline: The project is expected to be completed within 12 months, with software procurement and system configuration taking six months, user training taking three months, and system rollout taking three months.
  • Budget: The project budget is $2 million, which includes costs for software procurement, system configuration, user training, and system rollout.
  • Risks and Assumptions: Risks include unexpected technical difficulties and unforeseen expenses, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the IT team, healthcare providers, project sponsor, and executive team.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Education Project Charter:

  • Project Objective: To design and implement a new curriculum for a school district.
  • Project Scope: The scope of the project includes curriculum research, curriculum design, curriculum implementation, and curriculum evaluation.
  • Stakeholders: The stakeholders for the project include the education team, school district administrators, project sponsor, and local government agencies.
  • Deliverables: The deliverables for the project include curriculum research report, curriculum design plan, curriculum implementation plan, and curriculum evaluation report.
  • Milestones: The milestones for the project include curriculum research, curriculum design, curriculum implementation, and curriculum evaluation.
  • Timeline: The project is expected to be completed within 24 months, with curriculum research and design taking 12 months, curriculum implementation taking eight months, and curriculum evaluation taking four months.
  • Budget: The project budget is $5 million, which includes costs for curriculum research, curriculum design, curriculum implementation, and curriculum evaluation.
  • Risks and Assumptions: Risks include changes in education policy and unforeseen expenses, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the education team, school district administrators, project sponsor, and local government agencies.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and school district administrators.

Technology Upgrade Project Charter:

  • Project Objective: To upgrade the company’s technology infrastructure to improve efficiency and productivity.
  • Project Scope: The scope of the project includes technology assessment, technology upgrade design, technology upgrade implementation, and technology upgrade evaluation.
  • Stakeholders: The stakeholders for the project include the IT team, executive team, project sponsor, and company employees.
  • Deliverables: The deliverables for the project include technology assessment report, technology upgrade design plan, technology upgrade implementation plan, and technology upgrade evaluation report.
  • Milestones: The milestones for the project include technology assessment, technology upgrade design, technology upgrade implementation, and technology upgrade evaluation.
  • Timeline: The project is expected to be completed within 18 months, with technology assessment and upgrade design taking six months, technology upgrade implementation taking 10 months, and technology upgrade evaluation taking two months.
  • Budget: The project budget is $3 million, which includes costs for technology assessment, technology upgrade design, technology upgrade implementation, and technology upgrade evaluation.
  • Risks and Assumptions: Risks include technical difficulties and unforeseen expenses, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the IT team, executive team, project sponsor, and company employees.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Event Planning Project Charter:

  • Project Objective: To plan and execute a successful charity fundraising event.
  • Project Scope: The scope of the project includes event planning, vendor management, sponsorship management, and event execution.
  • Stakeholders: The stakeholders for the project include the event planning team, project sponsor, event vendors, and event attendees.
  • Deliverables: The deliverables for the project include event planning document, vendor contract documents, sponsorship agreement documents, and event execution plan.
  • Milestones: The milestones for the project include event planning, vendor management, sponsorship management, and event execution.
  • Timeline: The project is expected to be completed within six months, with event planning taking two months, vendor and sponsorship management taking two months, and event execution taking two months.
  • Budget: The project budget is $100,000, which includes costs for event planning, vendor management, sponsorship management, and event execution.
  • Risks and Assumptions: Risks include weather-related cancellations and changes in sponsorship agreements, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the event planning team, project sponsor, event vendors, and event attendees.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and event planning team.

Healthcare Improvement Project Charter:

  • Project Objective: To improve patient satisfaction scores in a hospital.
  • Project Scope: The scope of the project includes patient satisfaction assessment, patient satisfaction improvement plan, and patient satisfaction evaluation.
  • Stakeholders: The stakeholders for the project include the hospital administration team, healthcare providers, project sponsor, and patients.
  • Deliverables: The deliverables for the project include patient satisfaction assessment report, patient satisfaction improvement plan, and patient satisfaction evaluation report.
  • Milestones: The milestones for the project include patient satisfaction assessment, patient satisfaction improvement plan, and patient satisfaction evaluation.
  • Timeline: The project is expected to be completed within 12 months, with patient satisfaction assessment taking four months, patient satisfaction improvement plan taking six months, and patient satisfaction evaluation taking two months.
  • Budget: The project budget is $500,000, which includes costs for patient satisfaction assessment, patient satisfaction improvement plan, and patient satisfaction evaluation.
  • Risks and Assumptions: Risks include changes in healthcare policy and unforeseen expenses, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the hospital administration team, healthcare providers, project sponsor, and patients.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and hospital administration team.

IT Project Charter:

  • Project Objective: To implement a new software system for a company.
  • Project Scope: The scope of the project includes software assessment, software selection, software installation, and user training.
  • Stakeholders: The stakeholders for the project include the IT team, company executives, project sponsor, and end-users.
  • Deliverables: The deliverables for the project include software assessment report, software selection report, software installation plan, and user training materials.
  • Milestones: The milestones for the project include software assessment, software selection, software installation, and user training.
  • Timeline: The project is expected to be completed within 18 months, with software assessment and selection taking six months, software installation taking eight months, and user training taking four months.
  • Budget: The project budget is $2 million, which includes costs for software assessment, software selection, software installation, and user training.
  • Risks and Assumptions: Risks include software compatibility issues and unforeseen expenses, and assumptions include the availability of resources needed to complete the project.
  • Project Organization: The project team will be led by the project manager and will include representatives from the IT team, company executives, project sponsor, and end-users.
  • Sign-Off: The project charter will be signed off by the project sponsor, project manager, and IT team.

Overall, a well-developed project charter provides a solid foundation for any project, and can help ensure that the project is completed on time, within budget, and to the satisfaction of all stakeholders involved.

Examples of Project Charter Elements

A project charter typically includes the following elements. We will see the different examples of the Project Charter in this topic. To give you a better idea of how these elements are used in real-life scenarios, here are some examples:

Project Objective

Project Objective: To design and develop a mobile app for an e-commerce platform that will increase sales by 20% in the next six months.

Example:

A retail company wants to create a mobile app for its online store. The project objective is to increase sales by 20% in the next six months by making the shopping experience more convenient for customers.

Project Scope

Project Scope: The scope of the project includes designing and developing the mobile app, testing the app for functionality and usability, and integrating the app with the e-commerce platform.

Example:

The scope of the project includes designing and developing a mobile app for an online marketplace, testing the app for functionality and usability, and integrating the app with the marketplace website.

Stakeholders

Stakeholders: The stakeholders for the project include the project sponsor, project manager, project team, executive team, and end-users.

Example:

The stakeholders for a healthcare software development project may include the project sponsor, project manager, project team, executive team, IT department, healthcare professionals, and patients.

Deliverables

Deliverables: The deliverables for the project include a functional and user-friendly mobile app, integration with the e-commerce platform, and a user manual.

Example:

The deliverables for a website redesign project may include a new website design, updated content, and a user-friendly interface.

Milestones

Milestones: The milestones for the project include completing the mobile app design, completing the mobile app development, testing the app for functionality and usability, and integrating the app with the e-commerce platform.

Example:

The milestones for a construction project may include completing the site survey, obtaining necessary permits, completing the foundation, and completing the structure.

Timeline

Timeline: The project is expected to be completed in six months, with the mobile app design and development taking three months and the testing and integration taking three months.

Example:

A marketing campaign project may have a timeline of six weeks, with two weeks for planning, two weeks for execution, and two weeks for analysis.

Budget

Budget: The project budget is $500,000, which includes costs for design and development, testing and integration, project management, and contingencies.

Example:

A new product launch project may have a budget of $1 million, which includes costs for research and development, marketing, and distribution.

Risks and Assumptions

Risks and Assumptions: The risks include potential delays due to unforeseen technical issues, and the assumption is that the project team will have the necessary technical expertise to address any issues that arise.

Example:

A software development project may have risks related to potential security breaches, and the assumption is that the IT team will have the necessary security measures in place to prevent breaches.

Project Organization

Project Organization: The project team will be led by the project manager and will include representatives from the IT department, the marketing department, and external vendors.

Example:

The project team for a website redesign project may include a project manager, a web developer, a graphic designer, a content writer, and a quality assurance specialist.

Sign-Off

Sign-Off: The project charter will be signed off by the project sponsor, project manager, and executive team.

Example:

A construction project may require sign-off from the project sponsor, project manager, construction contractors, equipment suppliers, and regulatory bodies before beginning construction.

Conclusion

A project charter is a critical document that sets the foundation for a successful project. The elements of a project charter, such as project objectives, project scope, stakeholders, deliverables, milestones, timeline, budget, risks and assumptions, project organization, and sign-off, provide a comprehensive framework for project management. Real-time examples demonstrate how each element is used in different scenarios, and project managers can use this information to create effective project charters for their own projects. By creating a well-defined project charter, project managers can establish a clear direction, ensure stakeholder alignment, and mitigate risks, ultimately leading to project success.

Effortlessly Manage Your Projects and Resources
120+ Professional Project Management Templates!

A Powerful & Multi-purpose Templates for project management. Now seamlessly manage your projects, tasks, meetings, presentations, teams, customers, stakeholders and time. This page describes all the amazing new features and options that come with our premium templates.

Save Up to 85% LIMITED TIME OFFER
Project Management Templates

All-in-One Pack
120+ Project Management Templates

Essential Pack
50+ PM Templates

Excel Pack
50+ Excel PM Templates

PowerPoint Pack
50+ Excel PM Templates

MS Word Pack
25+ Word PM Templates

Ultimate Project
Management Template
Ultimate Resource
Management Template
Project Portfolio
Management Templates
Last Updated: March 10, 2023

Leave A Comment